Huawei SUN2000-8KTL-M2 Quick Manual page 21

Hide thumbs Also See for SUN2000-8KTL-M2:
Table of Contents

Advertisement

6.4
Setting the Physical Layout of Smart PV Optimizers
If Smart PV Optimizers are configured for PV strings, ensure that the Smart PV Optimizers have
been successfully connected to the solar inverter before performing the operations in this
section.
The PV strings connecting to the same MPPT route should contain the same number and
model of PV modules or Smart PV optimizers.
Check that the SN labels of Smart PV Optimizers are correctly attached to the physical layout
template.
Take and save a photo of the physical layout template. Place the template on a flat surface.
Keep your phone parallel to the template and take a photo in landscape mode. Ensure that the
four positioning points in the corners are in the frame. Ensure that each QR code is attached
within the frame.
For details about the physical layout of Smart PV Optimizers, see
Scenario 1: Setting on the FusionSolar Server Side (Solar Inverter Connected to
the Management System)
1. Tap the plant name on the Home screen to access the plant screen. Select Plant layout, tap
and upload the physical layout template photo of the PV plant as prompted.
2. Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the FusionSolar Smart PV
Management System. On the Homepage page, click the plant name to go to the plant page.
Select Plant layout. Choose
prompted. You can also manually create a physical location layout.
> Generate with AI, and create a physical layout as
20
FusionSolar App Quick Guide
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-20ktl-m2Sun2000-17ktl-m0

Table of Contents