•
Slide the second clamp (12) over top post lower section (9) then join onto the
middle post and secure with 3 M5x6 screws.
•
Ensure the upper clamp is fitted to the thinner section of upper post.
•
Fit the heater unit to the top of the upper post and secure by tightening the knob.
•
Clip the mains lead into the two clamps and adjust their position up and down to
hold the lead neatly and securely.
Mains Lead
Clamp
Clamp
Lower Post
Clamp
Screws
5
Heater
Mains Lead