Page 8
1. The installer must ensure the desired mounting point for the gate is level, plumb and rigid. 2. Use fixings appropriate to the material into which they are being fixed (not included). 3. Check all parts are included. Contact Barrier Group immediately if you are missing a piece. AFTER INSTALLATION CARE Barrier Group recommends that you check the operation of your gate at least every six months (more regularly in extreme environments or frequent use).
Need help?
Do you have a question about the DOCK-SAFE and is the answer not in the manual?
Questions and answers