INSTALLATION INSTRUCTIONS
1. Flush all piping thoroughly before installing.
2. Remove knobs A, B, and C.
3. Remove the four-bracket screws (D) and panel screws
(E) then remove stainless steel box assembly. Do not
remove front panel from box.
NOTE: There are six (6) bracket screws on the pres-
sure equalizing models.
4. For wall mounting, use rough-in drawing to locate
mounting holes on wall. Mount bracket to wall. Do not
remove mixer assembly from bracket.
THERMOMETER CALIBRATION
1. If thermometer should need calibration, remove front
knobs A, B, and C and the front panel screws E.
440-1000
CAPACITY
"A"
"B"
"C"
6 gpm
5-7/8
1-1/2
2-7/16
440-3000
CAPACITY
"A"
"B"
"C"
14 gpm
5-3/4
1-3/4
2-11/16
"D"
"E"
2-3/8
4-3/4
"D"
"E"
2-7/16
6-3/4
INSTALLATION INSTRUCTIONS
SERIES 440 FOTOPANEL
5. Make final connections to hot and cold supplies and
outlet from vacuum breaker. Facing front of mixer,
connect hot water to left side (marked HOT) and cold
water to right side (marked COLD). Inlet connections
must be piped correctly for proper operation of
Fotopanel. NOTE: Do not exert excessive torque on
the outlet pipe when connecting it to the vacuum
breaker which is supported by a plastic manifold.
6. Replace stainless steel box assembly and attach
knobs A, B, and C and the front panel screws E.
2. Calibration screw is located on back of thermometer
case.
ROUGHING- IN DIMENSIONS
TOP EDGE OF CABINET
4-19/32"
3-5/8"
HOLE SIZE
(TO SUIT METHOD
OF FASTENING)
II-129-025
MUST BE LEVEL
2-3/4"
4-19/32"
VERTICAL CENTER
LINE OF CABINET
Need help?
Do you have a question about the 440 Series and is the answer not in the manual?
Questions and answers