Commissioning - Bego Otoflash Translation Of The Original Operating Instructions

Hide thumbs Also See for Otoflash:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 20
English ⋅ Otoflash
en

Commissioning

Before commissioning, set the device to the correct input voltage using the selector switch (12) on the back
of the device.
When moving the device from colder to warmer ambient temperatures (e.g. transport in the winter), allow it
to acclimatize for a minimum of 2 hours (to prevent the risk of flashovers inside the device).
1
2
3
Fig. 2
Front side
9
Fig. 3
Rear side
24
8
4
5
6 7
11
10
12
13 14
1.
Power switch (mains switch)
2.
Protective gas switch
3.
Protective gas indicator lights
4.
Display with keypad
5.
Start button
6.
Lamp indicator lights
7.
Ready indicator
8.
Polymerization chamber
9.
Fan
10. Protective gas connection
11. Type plate
12. Selector switch (100, 115, 230 V)
13. Mains socket with fuse
14. Operating hour meter
Holding trays:
2 Plexi trays with UVB blockers are available,
labelled 360N2.

Advertisement

Table of Contents
loading

This manual is also suitable for:

26465

Table of Contents