MINIMUM VIBRATION -
THE FOLLOWING FOUR STEPS ARE
EXTREMELY CRITICAL
Figure 3
Install hub onto coupling and fasten in place with the four (4)
3/4" cap screws and lock washers used on the hub-shipping pallet
(See Figure 4). Make sure coupling is pulled down evenly. Tight-
en cap screws to recommended standard of 125 ft-lb (lubricated)
or 130 ft-lb torque.
Figure 4
Installation manual 1000H
Rigidly attach dial indicator to the air line support or other sta-
tionary object. Measure run-out of the rotary joint (See Figure 5).
Rotate hub 360° to locate point of minimum reading on the dial;
set indicator to read zero at this point.
Figure 5
Rotate coupling 360° while watching indicator at rotary
joint for misalignment reading. Total indicated run-out
should be 0.005". If run-out is over 0.005", mark low point
on face of coupling. Install shims under hub at low point
(See Figure 6).
Figure 6
Page 3 of 10