(AV) hubs feature Timken tapered roller bearings and synthetic lubricants. All components are suitable for high and low temperature operation and are interchangeable (except hub bodies) in 4, 5, or 6 blade configu- rations. Hudson AV hubs are durable and designed for low maintenance and energy saving operation. ®...
RECOMMENDED TOOLS Long T-Handle Allen Wrench Set (3/16" to 3/8") Shop Towels ® Medium Size Flat Head Screw Driver Exact-A-Pitch Digital Protractor (P/N 62375) Brass Ball Peen Hammer 25 ft. Measuring Tape Flat Bastard File Pencil or Marker ...
Page 3
MINIMUM VIBRATION - Rigidly attach dial indicator to the air line support or other sta- tionary object. Measure run-out of the rotary joint (See Figure 5). THE FOLLOWING FOUR STEPS ARE Rotate hub 360° to locate point of minimum reading on the dial; EXTREMELY CRITICAL set indicator to read zero at this point.
Page 4
After fan is installed in fan ring, outline top end of each blade onto fan ring with a marker. The difference between levels of ® Use Hudson EXACT-A-PITCH digital protractor (See Figure 8) highest and lowest outlines should not be more than 1/2" (See or a bubble protractor to set blade pitch.
Page 5
Correct blade track by loosening clamp bolts and adjusting blade Fan Size (ft) Minimum Maximum to match track of other blades. Re-tighten bolts and re-check track and pitch angle setting. Re-tighten blade clamp bolts to 5 through 9 1/4" 1/2" recommended standard of 55 ft-lb (lubricated) or 60 ft-lb (dry) torque.
Connect both supply and instrument lines. Check instructions included with bias relay. If problems are encountered, contact Hudson fan engineer. Instrument air pressure should be 3-15 psi. Bias relays are adjusted for 3 psi instrument starting point. Supply air pressure should be set to level according to table below.
Page 7
Start fan and check rotation. Viewed from top (discharge), fan blades should rotate clockwise. Hudson recommends to re-verify the blade clamp torque after the initial 10-15 minutes of cold operation (i.e., the fan doesn’t need to be exposed to the working temperature of the process).