Summary of Contents for Suncast Homeplace Octagon Vinyl Gazebo

  • Page 1 © Suncast Corporation Octagon Vinyl Gazebo Assembly Instructions For 10’ & 12’ Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.HomePlaceStructures.com Package ships as shown...
  • Page 2 When your kit arrives, it should look like this. Inspect the package for any damage that may have oc- curred during shipping - dented corners, punctured plastic, etc. If the package is damaged, alert HomePlace Structures immediately at 866.768.8465 © Suncast Corporation...
  • Page 6 Step 4: Remove the contents of the box and organize like parts Step 5: Use a tape measure to together. Set parts close to assembly location. find and mark the location of the center of gazebo floor. © Suncast Corporation page 01...
  • Page 7 Step 9: Align the edge of the band board with center of the double joist and attach each end using two 3” screws in the pre-drilled holes. Note: It is important that the top edges of the band board and joist are aligned flush. © Suncast Corporation page 02...
  • Page 8 Step 11: Repeat steps 9 & 10 until all band boards are installed. Step 12: Insert connecting plates double joists as shown. Note: If opening is tight, step on connecting plates to push them down. © Suncast Corporation page 03...
  • Page 9 Floor is now ready for installation of middle joists. Incorrect angle alignment Step 15: Locate the 16 middle 16: Place one middle joist in each floor section. floor joists. Note: Make sure to properly align cut angles of joist. © Suncast Corporation page 04...
  • Page 10 Step 19: Attach band board to middle joist using 3” screws in pre- holes in band board. drilled holes. Step 20: Attach middle joists to double joist using two 3” screws as Step 21: Repeat steps 18-20 for shown. the remaining middle joists. © Suncast Corporation page 05...
  • Page 11 Step 26: Attach floor board to ter of double joist. floor framing using one 2-1/2” screw as shown. Note: It is recommended to put remaining screws in pre-drilled holes after each of the perime- ter boards are in place. © Suncast Corporation page 06...
  • Page 12 2-1/2” screw as shown. edge of board. Step 30: Repeat steps 25-28 and install adjacent floor board and attach using one 2-1/2” screw at each end. Step 31: Install remaining perimeter floor boards repeating steps 25-29. © Suncast Corporation page 07...
  • Page 13 Step 35: Pre-drill one 3/16” hole Step 36: Attach floor boards to middle joist. above middle floor joist. Step 37: Repeat steps 33-36 for remainder of floor boards in that row. © Suncast Corporation page 08...
  • Page 14 Step 39: Install center floor pieces as shown. Note: The center board may re- Step 40: Attach middle floor Floor board installation is quire additional force in order to boards to sub-floor using 2-1/2” complete. make it fit. screws through pre-drilled holes. © Suncast Corporation page 09...
  • Page 15 Step 43: Attach trim board to sub-floor using 1-1/2” white screws in pre-drilled holes. Step 44: Align adjacent trim piece and attach repeating steps 41 & 42. Step 45: Repeat steps 41-44 around perimeter of gazebo. © Suncast Corporation page 10...
  • Page 16 Step 3: Carefully cut open shrink assembly site as possible. bands. wrap, making sure not to allow product to fall off of the skid. Step 4: Remove the four packages of posts from the skid. © Suncast Corporation page 11...
  • Page 17 Step 7: Remove bottom railing box from the skid, place in close prox- imity to assembly site, and remove lid. Each railing section consists of a Step 8: Locate and open the box containing the railing spindles. top T-rail and bottom straight rail. © Suncast Corporation page 12...
  • Page 18 Step 12: Attach bottom railing to insert using 1” railing screws in pre- drilled holes on outside and inside of railing. Note: Make sure railing section is tight against post before fastening. Step 13: Insert railing spindles into bottom railing piece as shown. © Suncast Corporation page 13...
  • Page 19 Step 15: Slide the top railing onto the railing insert and attach as shown. Step 16: Locate a standard post with four railing inserts and slide top and bottom railing pieces onto inserts as shown. Step 17: Push railing tight against post and attach using 1” screws. © Suncast Corporation page 14...
  • Page 20 Step 19: Continue around perimeter of gazebo until all bottom railing sections are installed. Top Brace Installation Step 20: Remove a top brace section from box and pull grooved slot into top of posts as shown. © Suncast Corporation page 15...
  • Page 21 Step 22: Pull brace section down tight against top of post, align centered on post, and attach using 2-1/2” white screws through pre-drilled holes. Step 23: Continue around perimeter of gazebo until all brace sections are fastened to posts. © Suncast Corporation page 16...
  • Page 22 Step 25: Remove rafter box from skid and unpack components. Step 26: Place a step ladder in Step 27: Prepare roof bolts by putting a nut and washer on one end the center of the gazebo. of the bolt as shown. © Suncast Corporation page 17...
  • Page 23 Step 30: Put a washer and nut on the opposite end of the bolt and tighten by hand. Step 31: Repeat steps 28-30 for rafter on opposite side as shown. © Suncast Corporation page 18...
  • Page 24 Step 33: Repeat steps 28-32 for next set of rafters as shown. Step 34: Install 4 remaining Step 35: Tighten acorn nuts with rafters repeating previous steps tools after all rafters are installed. as shown. © Suncast Corporation page 19...
  • Page 25 Step 39: Align adjacent board. Step 40: First attach adjacent Step 41: Pull band board into place, align with first rafter, and attach. band board at opposite corner. Step 42: Continue installing band boards around entire perimeter of gazebo. © Suncast Corporation page 20...
  • Page 26 Step 45: Slide groove of next roof board into the tongue on the previously installed board and attach with two nails at each end as shown. Step 46: Repeat step 45 until entire section is complete. Step 47: Repeat steps 44-46 for each roof section. © Suncast Corporation page 21...
  • Page 27 Step 49: First align and attach ad- Step 50: Align corners of face boards and attach to band board. jacent face board at opposite cor- ner. Step 51: Continue installing face board around perimeter of gazebo. © Suncast Corporation page 22...
  • Page 28 Step 53: Center the bottom point of roof bracket and fasten to roof using 10d nails as shown. Note: Make sure nails go into rafters and 2x4 face board and do not protrude through bottom of ceiling/roof boards. Flower Box Installation Step 54: Install flower boxes where desired using 2” white screws. © Suncast Corporation page 23...
  • Page 29: Installation Instructions

    Installation Instructions screen package for wood & vinyl octagon gazebos Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.HomePlaceStructures.com revised 8/12/09...
  • Page 30: Tools Needed

    TOOLS NEEDED: 1. Hammer 2. Utility Knife 3. Measuring Tape 4. Screw Gun Note: This manual was created to provide screen installation instructions for HomePlace Structures wood and vinyl octagon gazebos. De- pending on the unit that was purchased, some of the pictures shown will differ from your unit.
  • Page 31 Step 6: Install screen panel by Step 7: Slide bottom of screen panel in Step 8: Repeat previ- sliding top in as shown. place and push snug against post as ous steps to install re- shown. maining six screen panels. © Suncast Corporation Page 01...
  • Page 32 10 & 11. Step 10: Install filler strip above door and fasten with 2-1/2” screws as shown. Step 11: Install plastic door jamb strip and fasten with 2-1/2” screws as shown (flush with outside of post). © Suncast Corporation Page 02...
  • Page 33 Step 12: Install aluminum Z-strips on sides of door using 5 pan head screws per side as shown. Note: It is important to install side Z-strips first. Step 13: Install top Z-strip using pan head screws. Note: Z-strip corners should align as shown in picture. © Suncast Corporation Page 03...
  • Page 34 Step 17: Adjust door for correct Step 18: Install bottom sweep onto bottom of door and adjust to de- reveal at top and fasten with 4 or sired height. Note: No screws are needed for this piece. 5 self-tapping screws. © Suncast Corporation Page 04...