Download Print this page

Omron FLOW EM2100 Service Manual page 7

Fleet operation workspace

Advertisement

5. Replacing Dongles in an EM2100
Step
Check Item
1
Identify
Dongle ID
2
Turn off
EM2100 and
remove
power
3
Remove from
rack
4
Remove the
top panel
Screw size
PH1
4-40
FLOW Service Guide
In SetNetGo (SNG) go to the license tab. Record the EM2100 FLOW License ID Number.
Include this number when sending C2V to license administrator. Note: This step is only
necessary when replacing the EM2100 FLOW License Dongle
Turn off the power on the front panel using the Soft Shutdown procedure specified in the
EM2100 Installation Manual. Turn off the power on the back panel. Unplug power.
If installed in a rack, remove the EM2100 appliance from the rack. To do this pull the EM2100
forward until it is fully extended from track. Press the locking bottons on the side of the rail
and continue to pull until the EM2100 comes out rack. See the EM2100 Installation Guide for
more information.
Set the EM2100 appliance on an ESD protected workspace and follow standard ESD
grounding procedures prior to opening the unit. Using the Phillips head screwdriver, remove
the eight screws circled in red on the top of the EM2100. Slide the top back until it stops, lift
and remove the cover. Place cover upright to avoid scratching the top.
Task to be Performed
P/N 18982-008 Rev A
CAUTION: Wear an ESD strap
Check

Advertisement

loading

This manual is also suitable for:

Flow amr