Description
Assembly Letter
Front Floor Panel
J-5H51
Repeat Floor Panel
K-5H52
Left Side Panel
Right Side Panel
Left Back Panel
Right Back Panel
Left Front Panel
Right Front Panel
Wall Connector
Left Door
Right Door
Lock Hasp
Window for Door
Gasket for Door Window
Door Reinforcement
Hinge Reinforcement
Handle Kit
Spring Bolt Kit
Left Roof Panel
Left Skylight Roof Panel
Right Roof Panel
Right Skylight Roof Panel
Gable
Ridge Beam - Long
Ridge Beam - Short
Ridge Connector
Ridge Cap
Ridge Tape
Skylight w/Gasket Installed
Roof Connector
#14 x 1.0" Combo Pan Head Screw
#14 x 5/8" Combo Pan Head Screw
#8 x 1/2" Combo Pan Head Screw
#8 SAE Flat Washer
1/4-20 x 0.5" Combo Round Head Bolt
1/4-20 Flat Washer Zinc
1/4-20 Hex Nut
Roof Pin
GG
RS
FF
G
T
RL
L
D
T
N
C
H
Quantity
Required Tools
1
2
Safety Glasses
C
3
D
3
E
1
G
1
H
1
Rubber Mallet
J
1
Q
24
AK
1
AF
1
X
1
LL
2
Phillips Screw Driver
MM
2
NN
2
PP
2
QQ
1
SS
1
NN
2
Liquid Soap
AN
1
P
2
AP
1
M
2
RL
1
RS
1
FF
2
(2) Step Stools/Stepladders
GG
1
HH
2
Two Person Assembly
L
2
T
16
AA
56
JJ
12
KK
30
TT
30
BB
4
CC
2
DD
4
EE
4
P
T
L
AP
T
D
M
D
AF
F
AK
94.63"
128.85"
RUBBERMAID
7' x 10' 6" RESIN STORAGE BUILDING
ASSEMBLY INSTRUCTIONS
Pre-Assembly:
• Review the parts list and make sure that no parts are missing.
• Review ALL assembly steps before beginning instructions.
• Level the area where the shed will be located.
• Areas of "fill dirt" should be tamped/compacted to prevent settling/sinking.
• If a foundation is desired, it should be constructed before assembly.
NOTE:
To simplify assembly and to ensure proper engagement of all components,
apply a mild detergent to dovetail and snap fits before assembling.
In the event of severe weather, please disassemble and store in a secure location.
P
X
J
1S84
88.09"

Advertisement

loading
Need help?

Need help?

Do you have a question about the 1S84 and is the answer not in the manual?

Questions and answers

Summary of Contents for Rubbermaid 1S84

  • Page 1 K-5H52 J-5H51 1S84 Description Assembly Letter Quantity Required Tools Front Floor Panel J-5H51 Repeat Floor Panel K-5H52 Safety Glasses Left Side Panel 94.63" Right Side Panel Left Back Panel Right Back Panel Left Front Panel Rubber Mallet Right Front Panel...
  • Page 2 Level construction site before beginning assembly of shed. A foundation may be FLOOR PLAN: constructed if desired. Size the construction site to fit the entire floor. Allow clearance for opening front and back doors. OPTIONAL STEP: If desired, recessed anchor locations (8 places) can be used to anchor the shed floor to a foundation after Step 6.
  • Page 3 Using a utility knife, cut the long sides of each wall slot tab and then use a screwdriver to knock it out 6 places on Floor Panel (K-5H52) used in the MIDDLE position and 12 places on Floor Panel (K-5H52) used in the Back position. K-5H52 ( BACK POSITION ) K-5H52 ( MIDDLE POSITION ) Place the Floor Panel (J-5H51) on the foundation.
  • Page 4 Using a screwdriver, punch out the screw holes on the top of Left Side Panel (C) 2 places. Lubricate dovetails on Left Front Panel (H) 4 places with liquid soap. Connect Left Front Panel (H) into dovetails of Left Side Panel (C), engage snaps on Connect Left Side Panel (C) into Front Floor (J-5H51).
  • Page 5 Using a screwdriver, punch out the screw holes on the top of the Left Side Panel (C) Install Wall Connectors (Q) 5 places. 2 places. Align lap joint between Left Side Panels. Connect Left Side Panel (C) into Repeat Floor (K-5H52). K-5H52 click Lubricate dovetails on Left Back Panel (E) 4 places with liquid soap.
  • Page 6 Engage lap joint between Left Back Panel (E) and Right Back Panel (G) and Lubricate dovetails on Right Back Panel (G) 4 places with liquid soap. install Wall Connectors (Q) 4 places. Connect Right Back Panel (G) into dovetails of Right Side Panel (D), engage snaps on bottom of Right Back Panel (G) into Repeat Floor (K-5H52).
  • Page 7 Set the Left Door Panel (AK) face down on the ground. Starting at the top of the door, slide the Door Reinforcement (NN) onto the groove located on the handle side of the door. The Door Reinforcement (NN) will slide to the stop at the Slide the Hinge Reinforcement (PP) into the hole on the top door pin.
  • Page 8 Install Left Door Panel (K) inserting the lower hinge pin into Front Floor (J-5H51) Install Right Door Panel (F) inserting the lower hinge pin into Front Floor (J-5H51) socket, lift the left end of the Gable (M) enough to insert the top hinge pin on socket, lift the right end of the Gable (M) enough to insert the top hinge pin on Right Door Panel (F) into the Gable (M) socket.
  • Page 9 Apply Ridge Tape (HH) to Ridge Cap (GG) 2 places. Snap Ridge Cap (GG) onto the Place the Ridge Beam Assembly into cups at the top of each Gable (M). Ridge Beam Assembly covering the seam. OPTIONAL STEP: Align slots in Ridge Beam Assembly with holes in Gable (M) tab at back, install Bolt (BB), Washer (CC), and Nut (DD) 1 place, ONLY TIGHTEN NUT “FINGER”...
  • Page 10 Align slots in Ridge Beam Assembly with holes in Gable (M) tab, install Bolt (BB), Washer (CC), and Nut (DD) 1 place, ONLY TIGHTEN NUT “FINGER” TIGHT. Washer Plastic Tab DD CC on Gable Bolt Head Using a screwdriver, punch out the screwholes on the Left Skylight Roof Panel (AN) 6 places.
  • Page 11 Lubricate roof snaps on left side of the front Gable (M) 4 places. Raise the Left Roof Panel (N) onto the left side of the shed assembly, the arrows on the Roof Panel should face the inside of the shed and point towards the Ridge Beam Assembly.
  • Page 12 Raise the Left Skylight Roof Panel (AN) onto the left side of the shed assembly, the arrows on the Roof Panel should face the inside of the shed and point towards the Ridge Beam Assembly. Using (2) stepstools (1 inside shed, 1 outside shed), lift the bottom of Left Skylight Roof Panel (AN) above horizontal and guide into the Ridge Beam Assembly. Align the lap joint between the Roof Panels.
  • Page 13 Install Roof Connectors (T) 8 places. You may need to lift the roof panels to avoid the 2"x6" lumber. Engage all snaps between the Roof Panels and Gables. Then engage all snaps between Roof Panels and Wall Panels.
  • Page 14 Repeat Steps 29-35 for Right Roof of shed. Install Screws (AA) 16 places in front and back Gable (M). (16) See Steps 30, 31 See Step 29 See Step 32 See Step 33 Back of shed shown Caution: When installing screws do not overtighten. While 1 person holds down the bottom of the Roof, install Screws (AA) 12 places in Install Roof Pins (EE) 4 places connecting the Roof Panels to the Gables.
  • Page 15 94.63" 128.85" 88.09"...
  • Page 16 Congratulations! We hope you enjoy your Rubbermaid 7' x 10' 6" Storage Building! ® For more information on all Rubbermaid products, ® go to www.rubbermaid.com Customer Service Printed in U.S.A. © 2012 Rubbermaid Incorporated Toll Free: 1-888-895-2110 Huntersville, NC U.S.A. 28078-1801 M–F 8:30 AM to 5:00 PM EST...