2-15. RGBF BOARD
Install the RGBF board
into the slot.
1 two screws
2-16. RGBE BOARD
Install the RGBE board
into the slot.
–
Rear bottom view
–
mounting plate (bottom right)
Make sure that the projection
of the RGBF board is out.
hole
hole
2 mounting plate (bottom right)
Make sure that the projection
of the RGBE board is out.
mounting plate (bottom left)
2 mounting plate
(bottom left)
hole
3 RGBE board
1 two screws
slot
3 RGBF board
top side
slot
GTK-XB7
front panel block
boss
front side
bottom side
boss
front panel block
front side
17