Assembly Instructions
a. Apply Silicone Adhesive Sealant(TSE382C) into the
screw holes(4 portions) of Cutter Base (U).
b. Cutter Base Packing B for PC Jar is to be set in the
correct direction as shown in the figure. the grooves b
are to be in alignment with the holes a of Cutter Base
Cover.
c. Cutter Base Packing for SS Jar, Mill Cup & Chutney
Jar is to be set in the direction of Cutter Base Packing
rib side up.
d. After assembling PC Jar, Mill Cup & Chutney Jar, fill
the Jar(Cup) with maximum quantity of water (Refer to
Specifications: Page 3), keep it for 24 hrs and confirm
no water leakage. In case of water leakage, reassem-
bly Jar(Cup) in accordance with Assembly Instruc-
tions.
23