COMMISSIONING REPORT (Continued)
Flue Type & Diameter Of Connection To Boiler:-
TYPE................................/DIAMETER(mm).................
Where appropriate and for multi boiler installations sketch.
8.13
details of flue system showing length of runs and diameter
Conventional
Approximate Overall Height....................................m
8.14
Is The Fan Interlocked With The Boiler?
Are Flue Dampers Fitted?
8.15
If So Are They Interlocked?
8.16
Fan Assisted Ventilation?
8.17
Any Evidence Of Condensate Formation?
8.18
Any Evidence Of Water Leakage?
8.19
Any Evidence Of Flue Gas Leakage?
8.20
Has Boiler Been Built And Cased Correctly?
Is Gas Service Cock Installed?
8.21
If So Is It Accessible?
9.0
REPAIRS CARRIED OUT
NOTE: 6.6, 6.7 & 6.8 to be measured in secondary flue 600mm up
from the flue socket or at the sampling point provided.
Normally 6.12 and 6.13 are recorded when tapings provided.
Position of measurement to be in accordance with boiler and/or
burner manufacturers instructions.
*
Fully Electric Boilers
$
Thermo-Electric Boilers
c
Condensing Boilers
Note: It is the installer's responsibility to ensure that the boiler is correctly commissioned by a competent engineer and that this report is
completed as a permanent record. A commissioning service is available from Potterton Commercial at the address listed on the back page of
this manual. When a Potterton Commercial engineer commissions the boiler this commissioning report will be filled in and left with the boiler.
Commissioning by Potterton Commercial engineers is restricted to equipment of our supply. No responsibility will be accepted for the on site
assembly or installation of the equipment unless specifically carried out by Potterton Commercial. The installer must ensure that the boiler is
installed in accordance with the manufacturers instructions and all relevant B.S, Codes of Practice and Regulation. (see manufacturers
instructions for full details) Item 5.1 to 5.8 are related to the boiler instructions and as such these pre-commissioning check should be carried
out in the presence of the installer.
Baxi Heating Ltd. Registered Office:
Sir Frank Whittle Road, Derby DE21 4XA
Registered in England No. 3879156
Fan Assisted
Flue Dilution
YES
10.0
NOTES & COMMENTS BY COMMISSIONING
ENGINEER
NO
FINDINGS
Is The Installation Safe For Use?
If The Answer Is NO Has A Warning Label Been
Raised?
Is Any Remedial Work Required?
Have Warning Labels Been Fitted?
Has RIDDOR Form Been Raised?
CUSTOMER SIGNATURE:-
PRINT NAME:-
DATE:-
ENGINEER DETAILS
NAME
COMPANY
SIGNATURE
YES
NO
DATE
PCF No. 207/03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents