Potterton Derwent Compact Plus Installation, Operation & Maintenance Manual page 2

Table of Contents

Advertisement

Section 1
Fig 1
General Data and Dimensions
Table 1
Boiler Dimensions
Table 2
Connections
Table 3
Technical Data
Fig 2
Steel Base Strip Details
Clearances
Section 2
General
Optional Extras
Installation
Boiler Siting and Base
Section 3
Ventilation
- flue
- flue Size Considerations
- horizontal Flue Runs
- common Flue Systems
Water Circulation Systems
Boiler Protection
System Water Quality
- existing Systems
- new Systems
Sealed Systems
- noise level
Section 4
Boiler Installation
- risk Assessment
- manual Handling
- personal Protective Equipment 8
- confined Spaces
- electrical Safety
- preparation
COSHH
Customer Check List
Unpacking Boiler
Boiler Main Components
Control and Safety Equipment
Working Principles
Hydraulic Test of Boiler
- connecting the Water System 10
- condensate
- connecting the Electrical
Supply
- connecting the Flue
- connecting the Gas Supply
- boiler Controls
Section 5
Potterton Commercial Customer
Commissioning Check List
- contravention of
regulations
- commissioning
Index
Page
1
1
1
2
3
3
4
4
4
5
6
6
6
6
6
6
7
7
7
Section 6
7
7
7
Section 7
8
8
8
8
8
8
8
9
9
9
10
10
10
10
10
11
11
11
12
12
12
Control Panel
Gas Assembly
Set Up
Adjusting the Air
Low Load Control & Set Up
Important Safety
Emergency Instructions
Addition Checks
Pre-Lighting
Commissioning Live Run
Ionisation Current Check
Ventilation Checks
Operation of Ancillary Controls
Boiler Maintenance
Boiler Cleanin
Water Flow Swtich
Fault Finding
- overheat operation
- burner lockout
- general arrangement of pilot
burner
Wiring Diagram
Spare Parts Lists
Page
13
14
14
14
15
15
15
16
16
16
17
17
17
17
18-19
20
20-22
20
20
20
23-24
25-34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents