Download Print this page

Walton 01MOW4803-V3 General Instructions

Advertisement

Quick Links

General Instructions
01MOW4803-V3
Overlap mower store
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Protim Aquatan* T5 is a coloured, water-based concentrate which is diluted with water to make a solution
for application to unseasoned timber. Protim Aquatan T5 treated wood is not protected against wood
destroying insects or wood decaying fungi. Further preservative treatment is required to protect against
these organisms.
Contains: Boric Acid, Sodium Hydroxide 32% solution, aqueous mixture of sodium dioctyl sulphosuccinate &
alcohols: 2,4,6-Trichlorophenol.
Hazard Statements:
H315: Causes skin irritation.
H319: Causes serious eye irritation.
H412: Harmful to aquatic life.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o -cuts responsibly – do not burn.
IF SKIN IRRITATION OCCURS: Get medical advice/attention.
IF IN EYES: Rinse cautiously with water for several minuets. Remove contact lenses, and continue rinsing. If
the irritation persists: Get medical advice/attention.
DO NOT INGEST.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading

Summary of Contents for Walton 01MOW4803-V3

  • Page 1 Please retain product label and instructions for future reference All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 01MOW4803-V3 Overlap mower store BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION...
  • Page 2 01MOW4803-V3 Please retain product label and instructions for future reference Step 1 Overall Dimensions: Length = 1429mm Width = 950mm Place the oor onto a rm and Height = 1419mm level base. Base Dimensions: Ensure the base has suitable Length = 1395mm Width = 910mm drainage &...
  • Page 3 Please retain product label and instructions for future reference Step 3 Step 4 Attach the door strips to either side of the Place the left gable onto the oor and secure at the corner with building. 3x50mm screws. *Ensure the strip sits fush to edge of the framing and there is NO overhang inside Fix to the oor using 2x50mm screws, ensure to screw through the framing...
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 8 Place the roof sheet on top of the building Attach the lrg and sml fascias to the and x into place with 10x30mm screws. front and sides of the building, xing into place using 9x30mm screws.
  • Page 5 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treat- ment immediately after the building has been assembled.