Page 3
1.) Take the eave-connector (1) and a ridge piece (2), slide the beam (3) over the square tube at the eave-connector (1) on the ridge-piece (2) until it covers the drilling. Fit through the M16x90 bolt and bolt them together...
Page 4
2.) Take the beam (5) with the already fixed inserts (5a). Slide the beam over the square tube at the eave connector (4) until the drill is covered, fix the M16x90 bolt and screw it together. Hang the beam (5) with the insert (5a) onto the ridge-piece (2) by fixing to bolt (6) through the it.
Page 5
3.) Take the beam (5) with the already fixed inserts (5a). Slide the beam over the square tube at the eave connector (4) until the drill is covered, fix the M16x90 bolt and screw it together. Hang the beam (5) with the insert (5a) onto the ridge-piece (2) by fixing to bolt (6) through the ridge-piece.
Page 6
4.) Slide the eave-purlin (10) over the eave-connector (1), (4) and (7) until the drilling is covered, fit the M12x90 bolt and screw them together. In case the eave-purlins (10) can not be slid on the corners, loose the connection at the eave connection (7) to the beam and slide the eave-purlin (10) as well as the beam (8).
Page 7
5.) Take the mast (11) and slide it from top into the ridge-piece (2) fix the top- cap (12) over the tube.
Page 8
6.) Fit the top-cap (5) over the mast (11). Put the roof cover on the frame. Pull the hooking track device (13) in the channel of the roof cover (14) on all sides. Hook the track (15) in the eave purlin (10).
Page 9
7.) To tension the cover you have to use the pulley (18) by hanging the hook (18a) onto the ring bolt(16). Take the hook (18b) and hang it on the ring bolt (17) on the mast (11), now pull the chained (19) until the requested tension is reached.
Page 10
8.) Lift the frame, slide the 8 legs (21) over the eave-connector (1), (4), (7) until the drilling is covers in full. Bolt the connection by use of the M16/90 bolt (22) together. Fix the foot-bolt in the base-plate (23) by. Lower the total frame to the ground.
Page 11
9.) Fit the door-part (24). Fix the walls (27) in. Hook the u-profiles (25) to the door parts (24). Slide the door in the u-profiles, fit the next door-part and fix the 2nd u-profiles and slide it to the door, now you can fasten the door-post to the eave purlin.
Page 12
9.) Put the legs straight. Secure the tent by knitting in the anchors to the holes of the baseplate. The pagoda comes with 16 ground-anchors.