Summary of Contents for Steelcase Elective Elements
Page 1
HIGH PEDESTAL ONE-HIGH NOTICE If you have a problem, question, or request, call Steps for correct installation of your local dealer, or Steelcase Line 1 at Soft close mechanism soft close drawers can be damaged if this step is skipped.
Page 2
Unlock and remove drawers (if any) from pedestal(s). Turn worksurface over onto clean, soft surface. Lower pedestal(s) onto worksurface and position as shown. To remove drawers push lever down on one side, and up on the other. A removable shelf is used on a 1.5 high pedestal to allow access to the stretchers.
Page 3
(4) screws per pedestal through Secure pedestal(s) to worksurface. holes in stretchers, 1-1/2" pan head Carefully turn assembly over, adjust leveling glides as needed, and reinstall drawers. a) Push drawer rails back into pedestal. b) Pull bearing cages into forward position. NOTE: for 18”...
Page 4
HINGE ADJUSTMENT A #2 screwdriver is recommended for adjusting hinge. UP/DOWN IN/OUT DOOR HINGE SIDE TO SIDE Page 4 of 4 939500237 Rev J...
Need help?
Do you have a question about the Elective Elements and is the answer not in the manual?
Questions and answers