Power On (Ac Power) - D-Link DGS-3000-28X Quick Installation Manual

24 10/100/1000base-t ports + 4 10gbase-x sfp+ ports l2 managed switch
Hide thumbs Also See for DGS-3000-28X:
Table of Contents

Advertisement

Available languages

Available languages

Figure 4 — Inserting transceivers into the transceiver ports

Power On (AC Power)

Plug one end of the AC power cord into the power socket of the Switch and the other end
into the local power source outlet. After the system is powered on, the LED will blink green
to indicate that the system is booting up.
Power Failure (AC Power)
In the event of a power failure, just as a precaution, unplug the power cord from the
Switch. After the power returns, plug the power cord back into the power socket of the
Switch.
Installing Power Cord Retainer
To prevent accidental removal of the AC power cord, it is recommended to install the
power cord retainer together with the power cord.
With the rough side facing down, insert the tie wrap into the hole below the power socket.
Figure 5 — Insert Tie Wrap into the Switch
4

Advertisement

Table of Contents
loading

Table of Contents