Inspection and maintenance work
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If na-
tional regulations and directives require shorter inspection and maintenance intervals, you should observe these instead of
the intervals listed. Each time inspection and maintenance work is carried out, carry out the required preparatory and com-
pletion work.
#
Maintenance work
1
Record all of the analysis results in the Benchmark Checklist in these
instructions
2
Ask the end user whether any significant problems occur when operating
the product
3
Use the diagnostics system to check the product's fault history
4
Visually inspect whether the air/flue pipe and its opening have been in-
stalled correctly in accordance with the set-up instructions
5
Check that the unit has been installed correctly and the connections have
been secured
6
Check that the condensate pipe is in good condition, that it is leak-tight
and that the drain is correct
7
Check whether all of the externally routed condensate pipes are dimen-
sioned correctly and have been insulated sufficiently (frost protection)
8
Check whether the gas flow rate corresponds with the specifications on
the data plate and lies within the tolerances specified in these instructions
9
If the gas flow rate lies outside of the tolerances specified in these in-
structions, eliminate the fault in accordance with the regulations and the
current technology
10
Check the general condition of the product and, if required, eliminate any
faults that are found
11
Calibrating the heat generator and measuring the CO/CO₂ content and
gas flow in heating mode
12
Logging the CO₂ content (air ratio) and CO/CO₂ ratio
13
Check the product's recirculation at the supply air test point on the air/flue
pipe. If required, inspect the entire air/flue system and, if necessary, cor-
rect the fault
14
Disconnect the product from the electrical installation
15
Checking the electrical plug connections
16
Removing dirt from the product and the vacuum chamber
17
Visually check the heat cell to ascertain its condition and detect any
leaks, corrosion, rust or damage, and carry out maintenance work, if
required
18
Check that the gas stopcock and service valves function correctly
19
Checking the quality of the heating water
20
Removing the compact thermal module
21
Checking the burner
22
Checking the insulating mats in the combustion area and replacing dam-
aged insulating mats
23
Cleaning the heat exchanger
24
Clean the condensate siphon and check the condensate discharge pipe
25
Installing the compact thermal module
26
Checking the pre-charge pressure for the internal expansion vessel
27
Reassemble the product
28
Opening the service valves
29
Filling the heating installation
30
Run the test operation on the product/heating installation including hot
water generation (if available) and, if required, purge the product/heating
installation
31
Completing inspection and maintenance work
32
Checking the gas type
42
Interval
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
at regular intervals
at regular intervals
at regular intervals
at regular intervals
Annually
at regular intervals
at regular intervals
After each time maintenance
work is carried out
Annually
Annually
Annually
Annually
Annually
Installation and maintenance instructions ecoTEC exclusive 0020193966_04
29
34
36
34
35
35
36
36
36
27
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vu 256/5‑7 (h-gb)

Table of Contents