Spring Cylinder Adjustment; Replacement And Disposal Of Spring Cylinder; Bolt Connections; Painting - Gardner Denver EMCO WHEATON E2110 Installation, Operation & Maintenance Manual

Top & bottom loading arms
Table of Contents

Advertisement

Instruction Manual
Top & Bottom Loading Arms
E2110, E2112, E2022, E2025
E2033, E2304, E2573, E2123,
E2313, E2121

9.9 Spring Cylinder Adjustment

See detailed instruction manual.

9.10 Replacement and Disposal of Spring Cylinder

Contact EMCO WHEATON in this matter.

9.11 Bolt Connections

Check all bolts for tightness and tighten to correct torque values after the first six
months of operation or after the 6
this check every other year.
Dimensions
M8
M10
M12
M16
M18
M20
M22
M24
M27
M30
M33
M36
M39
M42

9.12 Painting

If the loading arm has not been painted (refer to your order confirmation) the
customer must paint the loading arm to provide corrosion protection. Use the
same paint to repair any damage in the painting to ensure long-term corrosion
protection.

9.13 Hose

Check the hoses regularly for damage and leakage.
th
loading process (which ever comes first). Repeat
Bolt Torque [Nm] at =0,14
(Standard Friction)
Strength Class
6.8
8.8
B7
19
25
37
49
65
85
150
200
230
200
270
320
290
390
450
400
530
610
500
670
770
740
990
1140
1000
1340
1550
1370
1820
2100
1760
2340
2700
2280
3040
3520
2820
3760
4350
- 16 -
10.9
12.9
35
41
72
84
125
145
290
340
400
470
570
670
780
920
980
1150
1450
1700
1970
2300
2680
3130
3430
4020
4460
5220
5530
6470
A4-70
17.8
36
62
150
210
303
290
410
556

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents