Start-Up Procedure

Placing unit into service
Normal
Operation
Mode Icon
1. Fill the mineral tank with water
Keep ELEMENT33 in BYPASS

Press and hold the extra cycle button for 5 seconds, display will indicate BW, Backwash

cycle.
Partially open the bypass valve so that water Slowly begins to enter the resin tank. Allow

water to flow for 5-10 minutes. This will allow the media in the tank to become saturated.
Fully Open bypass valve to the service position.

Push extra cycle button once and let go, display will indicate the normal operation mode

icon.
Push extra cycle button for 5 seconds, this will start a manual regeneration from start-to-

finish. This will take approximately 12 minutes.
Start-up procedure is now complete.
The unit is now pressurized with water and ready for service.
Proceed to setting current time of day.

While in service, the Data Display alternates between time of day,
volume remaining or days to regeneration.

The Flow Indicator flashes when outlet flow is detected.

The Faucet Icon flashes if a regeneration cycle has been queued.