Site preparation

Site preparation

Getting started

This guide provides a pre-installation checklist and instructions for installing the Mobility RFS9510
Controller, accessing the Graphical User Interface (GUI), and performing initial configuration.

Pre-installation checklist

Location & equipment
Mobility RFS9510 Controller shipping container contents:
NOTE
Keep the front bezel keys in a secure location which can only be accessed by authorized personnel.
Additional equipment recommended
2
Do not install this equipment or work with its power circuits during thunderstorms or other
weather conditions that could cause a power surge.
Verify there is adequate ventilation around the device, and ambient temperatures meet
equipment operation specifications.
Consult your site survey and network analysis reports to determine specific equipment
placement, power drops, and so on.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Provide a sufficient number of power drops for your equipment.
Ensure adequate, dust-free ventilation to all installed equipment.
Identify and prepare Ethernet and console port connections.
Verify cable lengths are within the maximum allowable distances for optimal signal
transmission.
Mobility RFS9510 Controller
Locking front bezel with keys
Mounting rail kit
Brocade Mobility RFS9510 Controller Installation Guide (this document)
Standard, grounded 100-240 VAC 50/60 Hz connection
UPS (uninterruptable power supply)
Standard 19-inch rack (2U height) with mounting rails.
Brocade Mobility RFS9510 Controller Installation Guide
53-1002918-01