Vaillant ecoTEC plus VU Series Installation And Maintenance Instructions Manual page 29

Hide thumbs Also See for ecoTEC plus VU Series:
Table of Contents

Advertisement

Qnw from the data
plate
15.3
18.4
24.7
25.7
28.6
30.6
35.7
Condition: Gas flow rate not in the permissible range
Check all of the piping and ensure that the gas flow rates
are correct.
Only put the product into operation once the gas flow
rates have been corrected.
Condition: Gas flow rate in the permissible range
End the check programme P.01.
Allow the boiler to cool down by allowing pump overrun to
operate for a minimum of 2 minutes.
Record the boiler maximum gas flow rate onto the
Benchmark gas boiler commissioning checklist.
9.10.3 Checking the gas connection pressure (gas
flow pressure)
2
1
1.
Ensure that the gas inlet working pressure can be
obtained with all other gas appliances in the property
working.
2.
Close the gas stopcock (1).
3.
Undo the sealing screw on the test nipple (2).
4.
Connect a manometer to the test nipple (2).
5.
Open the gas stopcock (1).
6.
Start up the product with check programme P.01 (sys-
tem with eBUS control) or P.03 (installation without
eBUS control).
7.
In addition, ensure that maximum heat can be dissip-
ated into the heating system by turning up the room
thermostat.
8.
With the boiler operating at full load check that the gas
inlet working pressure at the reference test point (2)
complies with the requirements.
Permissible gas flow pressure for operation with
Natural gas H
9.
Should the pressure recorded at the reference test point
in the boiler be lower than indicated check if there is
any blockage in the pipework or if the pipework is un-
dersized.
0020238195_07 ecoTEC plus Installation and maintenance instructions
H gas in m³/h
−10%
Nom.
+5%
1.62
1.70
1.46
1.95
2.05
1.76
2.61
2.74
2.35
2.72
2.86
2.45
3.03
3.18
2.73
3.24
3.40
2.92
3.78
3.97
3.40
1.3 to 2.3 kPa
(13.0 to 23.0 mbar)
Condition: Gas flow pressure not in the permissible range
Caution.
Risk of material damage and operating
faults caused by incorrect gas connec-
tion pressure.
If the gas connection pressure lies outside
the permissible range, this can cause oper-
ating faults in and damage to the product.
Do not make any adjustments to the
product.
Do not start up the product.
If you cannot correct the failure, notify the gas supply
company and proceed as follows:
End check programme P.01.
Allow the boiler to cool down by allowing pump overrun
to operate for a minimum of two minutes.
Close the gas stopcock.
Remove the pressure gauge and retighten the sealing
screw (2) for the measuring nipple.
Open the gas stopcock (1).
Check the test nipple for gas tightness.
Close the gas stopcock (1).
Install the front casing.
Disconnect the product from the electrical installation.
You must not start up the boiler.
Condition: Gas flow pressure in the permissible range
End the check programme P.01.
Allow the boiler to cool down allowing pump overrun to
operate for a minimum of two minutes.
Close the gas stopcock (1).
Remove the pressure gauge and retighten the sealing
screw (2) for the measuring nipple.
Open the gas stopcock (1).
Check the test nipple for gas tightness.
Remove the front casing.
Reset boiler controls for normal operation.
Record the appliance gas inlet working pressure (kPa
resp. mbar) in the Benchmark gas boiler commissioning
checklist.
9.10.4 Checking the CO₂ content
1.
Start up the product with check programme (P.01).
Installer level – Overview (→ Page 38)
2.
Wait until the value that is read is stable.
Waiting period for reading a stable value: 5 min
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents