Download Print this page

Dancover Pagoda Tent EventZone Manual

3x3m 4x4m & 5x5m

Advertisement

Quick Links

Manual for
Pagoda Tent EventZone
3x3m 4x4m & 5x5m
20-08-2013

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pagoda Tent EventZone and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dancover Pagoda Tent EventZone

  • Page 1 Manual for Pagoda Tent EventZone 3x3m 4x4m & 5x5m 20-08-2013...
  • Page 2: Safety Advice

    Note: Marquees are intended for events and other arrangements and are as such only meant for short term temporary assembly and the following disassembly. Dancover warranty applies only to the normal use of the Product, normal wear and tear excepted, in accordance with written use instructions or manual.
  • Page 3 Side view Push the bolt and take the eave purlin over the eave knuckle Eave purlin Top view Eave purlin 1.) Take the eave-connector and push in the bolt, then fit the eave-purlin over the tube 40x40 until the bolt (2) slids in the hole. Repeat for all 4 corners, see drawing above.
  • Page 4 Roof beam Side view 40x40x2 Floor Eave purlin Top view Eave purlin Eave purlin Eave purlin 2.) Take the beams (4) and fit these in eave-connectors (1). Repeat at all four eave corners.
  • Page 5 Ridge connector Side view Roof beam 40x40x2 Floor Eave purlin Top view Eave purlin Eave purlin Eave purlin 3.) Take the ridge-piece (5) and turn the spindle (5a) down until the top comes out 3 cm. Lift the beams (4) to fit them in the ridge connectors, smoothly.
  • Page 6 mast top Side view Hooking track device Floor mast top Side view Hooking track device Floor 4.) Fit the top-cap (6) onto the spindle (5a) and put the roof-cover over the frame. Fix the in the channel-groove (7) of the roof-cover (8) on all 4 sides. Hook the track-device in the eave-purlins (3) and span the roof by turning the spindle (5a) until the required tensioning is reached.
  • Page 7 Side view Base plate Floor 5.) Lift the 4 legs and push the bolt (10), slide the legs over the eave connector until the bolt slids in.
  • Page 8 Side view Earth anchor Base plate Floor Earth anchor Base plate Floor 6.) Take the pagoda in position. After this fix the side-covers. Hit the earth-anchors (11) into the available holes of the base-plate (12). Each pagoda, comes with 4 earth-anchors.
  • Page 9: Contact Information

    Contact information Head office: Dancover A/S For more information Nordre Strandvej 119 G please visit: 3150 Hellebæk www.dancovershop.com Denmark National contact Denmark: Spain: denmark@dancover.com espana@dancover.com Italy: uk@dancover.com italia@dancover.com Germany: Switzerland: germany@dancover.com schweiz@dancover.com France: Austria: france@dancover.com austria@dancover.com Sweden: Norway: sverige@dancover.com norge@dancover.com...