1.
3x
6.
3x
4.
3x
5.
3x

2. Installation

- Transport the machine on the pallet to its
- 6 strong people are required to lift the machine
- The machine must be installed on a sturdy, dry

2.1 Preparing for installation

The machine is delivered ready for operation. As
an option, side tables, left and right, are available.
These should be mounted so that the surfaces are
level with the main table.
3.
2.
3x
2.
3x
5
destination using a pallet truck.
from the pallet.
and level floor.
Danger!
- The machine must not be located outside.
- Do not use in the vicinity of inflammable
liquids or gases.
- Do not use in humid environments.
- Protect mains cable against heat, oil and
sharp edges.
Danger!
The machine must not be put into operation
without the safety light beam.
3.
5.
3x
4.
3x
1.
3x
6.
3x

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 721-06LT Guillotine and is the answer not in the manual?

This manual is also suitable for:

721-05 lt

Table of Contents