Download Print this page
ABACUS Pisces Information Packet

ABACUS Pisces Information Packet

Adjustable height bath

Advertisement

Quick Links

PRE-INSTALLATION INSTRUCTIONS
ON SITE ASSEMBLY
INSTALLATION INSTRUCTIONS
INSTALLATION FIXING KIT
TESTING THE BATH
CLEANING & WARRANTY
Our products have been designed to the highest standard with safety and strength in mind.
Abacus Pisces 069/Info.P 04/14v1a
www.abacushealthcare.com
0808 256 4249
PISCES INFORMATION PACK

TABLE OF CONTENTS

`
1
2
2
2
3
4-9
10-11
12-14
8
15
16
17

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pisces and is the answer not in the manual?

Questions and answers

Summary of Contents for ABACUS Pisces

  • Page 1: Table Of Contents

    INSTALLER INSTRUCTIONS PRE-INSTALLATION INSTRUCTIONS ON SITE ASSEMBLY 10-11 INSTALLATION INSTRUCTIONS 12-14 INSTALLATION FIXING KIT TROUBLE SHOOTING TESTING THE BATH CLEANING & WARRANTY Our products have been designed to the highest standard with safety and strength in mind. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 2: General Information

    THIS PRODUCT IS DESIGNED TO BE SOLD ON A SUPPLY AND INSTALL BASIS BY A TRAINED CERTIFIED INSTALLER AND ELECTRICIAL WORK CARRIED OUT BY A QUALIFIED ELECTRICIAN. ONLY ACCESSORIES AUTHORISED BY THE MANUFACTURER SHOULD BE USED WITH THIS PRODUCT. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 3: Installer Instructions

    WARNING! This Bath moves. Ensure there are no objects or persons that can become trapped or injured while the bath raises or lowers. Transport wheels and Straps. Remove before installation. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 4 Bath End Feet Assembly” diagram. Where there are services or it is impossible to drill into the floor then the office must be advised so consideration can be given to a Chemical bonding installation. This may carry a surcharge. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 5 – 65mm. See Fig 2. Tails c/w elbow should be left at 65mm height off floor for manifold connection. Plumbing tails must be fitted with isolating valves. FIG 1 FIG 2 Minimum distance 25mm - Wall & bath sides. FIG 3 Typical plumbing layout for Side or end wall TAP END OF BATH Abacus Pisces 069/Info.P 04/14v1a...
  • Page 6 Floor must be sound, solid and even surface. Attention should be paid to the footplate area which will be drilled to a depth of 100mm and must be of sound construction with no buried services in foot plate area. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 7 Earth Bonding and Cross Bonding are to be fitted and tested for continuity in accordance with IEE regulations. Image for Plumbing and Electrical Supplies (2nd Spur fuse for Whirlpool) (Reference purposes only) -Side & end wall feeds. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 8 *Sleeve bolts will not grip unless the hole is cleaned out first ** Plugs to be fixed into lower section of floor and not floating section Should you experience difficulties please call our Technical Support Line 0870 066 0809 Abacus Pisces 069/Info.P 04/14v1a...
  • Page 9 Particular attention should be made on the area where the foot plate of the bath is to be sited. Dependent upon the void size it is usually acceptable to remove the material (often 100mm/4” polystyrene) and back filling with concrete. Under No Circumstances should fixing be made to the surface floor alone. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 10 0808 256 4249 PISCES ON SITE ASSEMBLY INSTRUCTIONS Follow these instructions if the unit comes in part form. Otherwise jump to page 12 Preparation a) Carefully remove all packaging and inspect all components thoroughly. Note: Do not use sharp knives or instruments to remove packaging around the finished surface areas of the bath.
  • Page 11 Connect the actuators using the colour reference Zip ties on the actuator and wires. Ensure the retaining clips are in place and also ensure that the cable is not allowed to dangle as this cause the wires to become hooked up on hoist legs or mops. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 12 0808 256 4249 Pisces 1700 Installation Requirements Items Items supplied with the kit should be as follows: Bath Shell x 1 with 4 x inbuilt seal housings for the platform rods Bathing/Changing Platform Bath Surround Panels x 1 End Base units. Left x 1. Right x 1.
  • Page 13 Immediately after installation, it is vital that the bath be connected to a mains supply for at least 24 hours before initial use, to ensure the batteries are fully charged. Failure to observe this requirement could result in the user not being able to exit the bath in the event of a mains failure. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 14 Ensure both Base plates are perfectly vertical – please use a spirit level FIG 3 Lift up edge of retaining Clip and insert Handset jack. Press the clip down again to secure in place. FIG 4 FIG 5 Abacus Pisces 069/Info.P 04/14v1a...
  • Page 15: Trouble Shooting

     This may occur after a power failure. Use the DOWN button on the handset. Lower the bath to its lowest position. This will automatically reset the bath so that both sides rise together. Bath Beeping  Mains power has failed to the unit – See section titled ‘Bath does not move’ Abacus Pisces 069/Info.P 04/14v1a...
  • Page 16 Ensure the Platform can easily be lifted by the front edge for cleaning underneath. WARNING In the event of mains failure during use of the bath, back-up batteries will enable the bather to exit the bath. Do not carry on using until mains power is restored. Abacus Pisces 069/Info.P 04/14v1a...
  • Page 17 Any consequence arising from unskilled or incorrect handling of the product is not covered by this guarantee. The following items, when supplied by Abacus Healthcare are guaranteed for a period of twelve months from the date of supply for the parts only (labour costs are not covered).