1.
Install electrical hook up that applies to your unit. Make sure to
review your Electrical Installation Checklist and wiring diagram
for 220/240-volt switch or DRC low voltage control.
NOTE: Da-Lift projector lift has been internally wired at
Da-Lite. External wiring is completed by installer conforming to
local and national codes. Be sure the wires are long enough for
the Da-Lift to go up and down.
240 Volt Wiring Diagram
Da-Lite offers two styles of 240-volt wall switches for standard operation. Please see wiring diagram included in wall switch box.
2. Test installation by carefully running Da-Lift "up" and "down"
several times. Be prepared to stop the Da-Lift. Duty cycle is three
(3) minutes ON and three (3) minutes OFF.
3. Make sure Da-Lift stops in the up direction flush with the ceiling.