3
Operating Procedures
3.8 – Operation
1. Place the On/Off Switch in the "Off" position.
2. Plug the unit into three phase 200-260 Vac 50/60 Hz power. This unit requires 60 amp service (contact
Tesla™ Industries for receptacle information.)
3. Place the On/Off switch in the "On position. After 2-3 seconds, the LED bar graph should light and the
fans should begin to operate. If the fans and LED bar graph do not operate, then check the AC outlet for
power.
3.9 – Normal Function Test Procedures
This section involves "normal function" test proce dures, and includes
steps necessary to ensure that the unit is operating within specified para-
meters prior to use. A digital multimeter (an example is shown in Figure
3.9.1) capable of measuring dc and ac voltage and resistance will be
required to perform some of the tests. These functional test procedures
should become routine.
Check Unit for Evidence of Damage
Check for dents, punctures, case distortion or misalignment, and cracked
or loose connec tors. If no damage is evident, proceed to the next step.
If damage is evident, contact Tesla™ Industries, Inc.
14
Circuit Breaker "On"
Circuit Breaker "Off"
Figure 3.9.1 – Digital Multimeter