Electrical Connections - Greenheck MiniCore Series Installation, Operation And Maintenance Manual

Energy core ventilator
Table of Contents

Advertisement

Electrical Connections

Before connecting power to the unit, read and
understand the following instructions and wiring
diagrams. Complete wiring diagrams are attached inside
the blower door of the unit.
All wiring should be done in accordance with the
National Electrical Code ANSI/NFPA 70 latest edition
and any local codes that may apply. In Canada,
wiring should be done in accordance with the
Canadian Electrical Code. The equipment must be
properly grounded.
CAUTION
If any of the original wire must be replaced, the
replacement wire must have a temperature rating of at
least 105ºC.
DANGER
High voltage electrical input is required for this
equipment. This work should be performed by a
qualified electrician.
Electrical Connection Location
MiniCore
5/10
5/10 with disconnect
All dimensions are in inches.
Electrical
Connection
Sequence for Wiring Unit
1. The unit's nameplate contains the voltage and total
amperage required. The wire supplying power to
the unit should be sized accordingly.
2. The main power line should be connected to the
appropriate terminal blocks.
Power may be routed to the unit through the
opening on the underside of the unit. The locations
for the opening are provided in the figure to
the right.
3. Refer to the wiring diagrams in this manual or in the
unit for controlling the unit.
8
Energy Core Ventilator
A
B
1
20.6
2.4
25.5
Core, Filter, and
Blower Access
Frost Control
Extremely cold outdoor air temperatures can cause
moisture condensation and frosting on the energy
recovery core. Frost control is an optional feature that
will prevent/control core frosting.
1. Timed exhaust frost control
This option is provided with a thermodisc mounted in
the outdoor air intake compartment.
Timed exhaust frost control includes a timer in
addition to the thermodisc. When timed exhaust frost
control is initiated, the timer will turn the supply blower
off. Time exhaust using default timer setting will shut
down the supply fan for 5 minutes every 30 minutes
to allow exhaust to defrost energy core. Use the test
procedure for troubleshooting.
Frost Control Test Procedure
1. Remove power from unit.
2. Jumper the temperature indicating thermodisc in
the unit control center. Thermodisc has a pre-set
temperature of 5ºF.
3. Set the frost control timer scale for T1 and T2 to 1m.
Set the timer settings for T1 and T2 to 10.
4. Add power to the unit. Blower should cycle on for one
minute, then turn off for one minute.
5. Remove power from unit and remove jumpers that
were placed. Re-set timer settings.
• T1 timer setting set to 5 and timer scale set to 10m
for 5 minutes of wheel off time.
• T2 timer setting set to 5 and timer scale set to
1h for 30 minutes of wheel on time
Timer
Scale
Timer
Settings
Timer
Scale
T1
T2
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Minicore 5Minicore 10Ecv

Table of Contents