Recommended Spares; Cylinder Content Gauge Replacement; Spares Scheduling - BeaconMedaes Manfiold Operation And Maintenance Instructions

Table of Contents

Advertisement

Manual Manifold
6.10.3 Start to unscrew the contact gauge, if you hear
gas escaping do not fully remove until the system is
fully drained (see figure 19).
Figure 19 - Cylinder Content Gauge Replacement
Cylinder Content
Gauge (Sealing washer
P/N: 2005896)
6.10.4 Replace the old seals if required.
Note - A new seal will allow for greater adjustment when
aligning the gauge.
6.10.5 Install the new gauge as per the old unit
including wiring as per figure 20.
Figure 20 - Contact Gauge Alarm Wiring
Cylinder content alarm input
(Wired on site)
5
1
2006230.03
6
7
6
7
8
2
3
4
2
3
Cylinder content gauge
(Wired on site)
6.10.6 Follow steps in section 6.11 to bring the
control panel back online.
6.11 Returning the Control Panel
Back online
6.11.1 After completing any repair work on
the control panel complete the step in section
3 - Commissioning, followed by section 4.4 -
Procedure to prime control panel.
Note - The panel may need to be purged as per
HTM 02-01 for UK installations, or as per relevant
standards if installed outside the UK.
7.
Recommended Spares and
Accessories
7.1

Spares scheduling

The following table is the recommended spares
holding, the number of recommended spares for
overseas customers are expressed in brackets and
take into account expected transport delays (see
table 12, figure 21).
Note - It is mandatory to replace 1st and 2nd stage
relief valves every 5 years.
Note - industrial regulators are recommended to
be replaced every 5 years. Although the medical
standards do not specifically identify the need to
replace the regulators within this time scale it is
considered good practice to do so. By replacing
the regulators when the relief valves are being
replaced, interruption of the gas supply is
minimised.
22

Advertisement

Table of Contents
loading

Table of Contents