Checking The Delivery Contents; Unpacking The Server - Hitachi DS7000 Series Installation Manual

Advanced server
Hide thumbs Also See for DS7000 Series:
Table of Contents

Advertisement

Chapter 1. Checking the Delivery Contents
1.1.

Unpacking the Server

Important Before unpacking the server inspect the server packaging
W020
W020:
The server drawer must not be unpacked before it has reached the
room temperature (24 hours in the computer room).
According to the server configuration, the following items are included:
• Compute Box fully populated
• Empty UBox
• UBox components
• 8-module connecting box
• 16-module connecting box
• Rack-mounting kits
• Screws and washers
for damage.
WARNING
Chapter 1.

Checking the Delivery Contents

1-1