4(A). Checking gas leakage for left piping
1) a. Connect the manifold gauge to the service port of 3-way valve.
b. Measure the pressure.
2) a. Keep it for 5-10 minutes.
b. Ensure that the pressure indicated on the gauge is the same as that of measured during the first time.
Evacuation (vacuum method) is recommended, for model 2.0 HP ~ 3.0 HP with the piping length more than 5 meter.
11.3.4. Evacuation of the Equipment
WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the
following procedure.
1. Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way valve.
• Be sure to connect the end of the charging hose with the push pin to the service port.
2. Connect the center hose of the charging set to a vacuum pump.
3. Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 cmHg (0 MPa) to
-76 cmHg (-0.1 MPa). Then evacuate the air approximately ten minutes.
4. Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the gauge does not
move after approximately five minutes.
Note: BE SURE TO TAKE THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5. Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.
6. Tighten the service port caps of the 3-way valve at a torque of 18 N
7. Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to "OPEN" using a hexagonal
wrench (4 mm).
8. Mount valve caps onto the 2-way valve and the 3-way valve.
• Be sure to check for gas leakage.
m with a torque wrench.
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-c18jkvCs-c24jkvCu-c24jkv

Table of Contents