Download Print this page

Toro 30124 Operator's Manual page 6

32” bagger for proline mid–size mowers

Advertisement

Install Chute and Grass Bag
Slide chute assembly under deflector and into
1.
locking position with mating part of hinge lock.
Insert locking pin (Fig. 5).
Support bracket on chute assembly
Note:
must hook behind pivot post on deck.
1
2
Figure 5
1
Deflector
2
Chute
Slide bag seems onto frame tubes so bag
2.
opening is positioned to front of mower (Fig. 6).
2
1
Figure 6
1
Frame tube
3
4
m–3910
3
Hinge lock
4
Lock pin
2
m–3911
2
Bag seam
Place open end of bag over chute flange. Draw
3.
up on string and secure with clip (Fig. 7).
3
Figure 7
1
Chute
2
Bag string
Installation
1
2
m–3912
3
Clip
5

Advertisement

loading