Download Print this page

Toro 30124 Operator's Manual page 5

32” bagger for proline mid–size mowers

Advertisement

Installation
Loosely secure front of bagger support to
4.
traction unit frame with (2) 1/2 - 13 x 1-1/4"
(32 mm) flange head bolts (supplied in loose
parts bag) and (2) 1/2-13 flange nuts previously
removed (Fig. 4).
Loosely secure rear of bagger support to bottom
5.
of R.H. bracket support and rear frame with (2)
3/8 - 16 x 1-1/4" (32 mm) bolts (supplied in
loose parts bag) and flange nuts previously
removed (Fig. 4).
2
4
6
1
3
4
Figure 4
1
Bag support
2
Frame tube
3
Bolt 3/8-16 x 1-1/4" (32 mm)
Reverse previously removed bolt and place
6.
through from behind rear frame. Secure idler
bracket, spacer, spring, wheel guard, bagger
support and washer (from bagger loose parts)
with previously removed flange nut (Fig. 4).
Slide frame tubes into ends of bag support and
7.
lock pins into horizontal position slots (Fig. 4).
4
Bolt 1/2-13 x 1-1/4" (32 mm)
5
Reverse bolt
6
Washer 5/16" (8mm)
2
5
m–3909

Advertisement

loading