Download Print this page

Festo CPV10-VI-P Series Assembly Instructions page 2

Multiple connector plate

Advertisement

Available languages

Available languages

Assembly instructions (en)
746 708 / 2009-07a
Multiple connector plate
CPV10-VI-P...
1. Parts list
P2
P4
P6
9053d_1
9053d_3
9053d_11
2. Preparing for assembly
9053d_5 und 9053d_12
9053d_2
Type
A _ 0.1
B _ 0.1
C _ 0.1
CPV10-VI-P...-D 1
P2
29
22
40
P4
29
42
40
P6
29
62
40
P8
29
82
40
†‡
Festo SE & Co. KG
Postfach
D-73726 Esslingen
++49/(0)711/347-0
www.festo.com
1 Multiple connector plate
P8
1
CPV10-VI-P...-D
2 Multiple connector plate
CPV10-VI-P...-C
3 Seals
CPV10-VI-P.M7
2
3
• Note the dimensions of
the cut-out for fitting
(! Table).
In order to comply with
protection class IP65:
• Make sure that the
surface near the sealing
surface:
– is flat.
– is free of marks and
scratches.
Mounting cut-out for
CPV10-VI-P...-D 1
D _ 0.1
N
8
2
28
4
48
6
68
6
9053d_4
A _ 0.1
B _ 0.1
C _ 0.1
Type
CPV10-VI-P...-C 2
P2
53
59
64
P4
53
79
64
P6
53
99
64
P8
53
119
64
3. Assembly
9053d_6
9053d_7
9053d_8
9053d_9
5 Nm _ 10%
9053d_10
9053d_17
Mounting cut-out for
CPV10-VI-P...-C 2
D _ 0.1
N
62
6
82
6
102
6
122
6
• Press the seals 3
supplied into the holes in
the CPV valve terminal.
• Note that the 3 and 4-part
3
seals supplied with the
end plates of the CPV
valve terminal are only
required with multiple
connector plate 2.
• Position multiple
connector plate 1 or 2
in the mounting cut-out
from inside.
1 / 2
• Fasten the multiple con-
nector plate 1 or 2 with
1 / 2
corrosion resistant N x M5
screws as per DIN EN ISO
4762.
• Select the screw length l
as follows. A screw depth
of at least 7.5 mm to max.
9.5 mm must be
guaranteed.
• Tighten the screws.
Maintain the permitted
tightening torque.
For mounting the valve
terminal CPV10:
• Observe the assembly
instructions for the
pneumatic section of the
valve terminal.

Advertisement

loading

This manual is also suitable for:

Cpv10-vi-p2Cpv10-vi-p4Cpv10-vi-p6Cpv10-vi-p8