Page 1
Component list EL-025 BASE(×1) CABLE CLIP(×1) TUBE FOLD ARM(×1) LCD MOUNT L=400mm(×1) 76mm(×2) FOR LCD monitor WASHER SPRING WASHER NYLON NUT 13(×2) 5/16"(×2) 5/16"(×2) SCREW M4*P0.7*L12mm (×8) WASHER BRAKE SCREW ALLEN WRENCH 12.5* 25*T=3(×2) M6*P1.0*L6mm(×2) NO.3(×1) WRENCH ALLEN WRENCH NO.13(×1) NO.4(×1)
Page 2
Assembly step STEP 2 STEP 1 Put the Fold arm(A) through the Tube(C). Installing Tube(C) on the base(D) and To adjust the height of Fold arm(A) then put on the Cable clip(E) on with Allen wrench(7). the tube for cable management. Fixed the brake screw(5) with Allen wrench(6) to avoid rotation of the tube.
Need help?
Do you have a question about the EL-025 and is the answer not in the manual?
Questions and answers