Lead Dress - Mitsubishi Electric 50P-GHS63 Service Manual

Gm2 chassis
Table of Contents

Advertisement

____
,
ILEAD DRESS!
Note : The inner wires are clamped so that they do not come close to heat generating or high voltage parts.
After servicing route all wires in their original position.
The Anode Lead Wires are routed so that no tensile strength applied to the caps. If the route of the Anode Lead Wires are
changed, return them to the initial route.
Clamp the Lead Wires along the clamping zone with mark * shown in the figure below.
Take care so that the Lead Wires are not slack.
:.2C;;
Optical Unit
Focus Pack
*Clamping Zone
*Hidden Clamping Zone
Aerial Clamp
• Clamping Zone shows the route of the Lead
Wire bundle the High Voltage Lead Wire and
the Lead Wire on the primary side.
Fig.3
-5-

Advertisement

Table of Contents
loading

Table of Contents