Refill Volume Adjustment - Canature BNT65 Series Operation Manual

Table of Contents

Advertisement

BNT65 Series Valve Operation Manual
Finger at red pointer is tonight.
Moving clockwise from red pointer, extend or retract fingers to obtain the desired
regeneration schedule.
The next table can be used to determine the regeneration frequency.
9. Manually advance the control to the beginning of the Brine Fill position and allow the
control to return to the Service position automatically.
10. Fill the brine tank with salt.
11. Place back cover on the control.
12. Make sure that any bypass valve is turned to the Service position.

Refill Volume Adjustment

Refill volume can be adjusted through Refill Regulator (see the following picture). To
adjust Refill volume, release the screw at first, and then turn the Refill Regulator to desired
volume according to the Meter Label of Brine Gear, finally tighten the screw.
Regeneration Reference Chart
- 4 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF