Operating Instructions
Lowering Tower - (From Upright Position)
Loosen screw E.
Rotate tower to line up arrows.
Tighten screw E.
On the Electric Winch Controls panel, move winch circuit breaker to the ON position.
Operate winch B EXTEND control switch to the DOWN position to lower tower.
Remove lock pin C.
Operate winch A RAISE control switch to the DOWN position to lower tower to
horizontal position.
Insert and lock pin D before moving or lifting.
On the Electric Winch Controls panel, move winch circuit breaker to the OFF
position.
Before Moving
Chock tires. Raise jacks.
Swivel all jacks to horizontal position and pin in place.
Withdraw outrigger locking pins and slide both outriggers to stored position. Install
locking pins.
Operate winch B EXTEND control switch to the DOWN position to lower tower.
Remove lock pin C.
Operate winch A RAISE control switch to the DOWN position to lower tower to
horizontal position; insert and lock pin D before moving or lifting.
Insert and lock pin D before moving or lifting.
On the Electric Winch Controls panel, move winch circuit breaker to the OFF
position.