Operating Instructions
Raise Tower
•
Operate winch A to raise tower.
•
Insert lock pin C to secure tower in upright position.
Extending Tower for Upright Operation
Extend and retract the tower only in the vertical or upright position.
•
With tower in upright position, operate winch B to extend tower to desired height. Do
NOT extend past maximum upright mark on tower.
•
Loosen screw E to rotate tower. Tighten screw E after rotating tower.
Operate in vertical or upright position with lock pin installed and locked.
Prior to Lowering Tower
•
Shut off lamps.
•
Shut off engine.
•
Disconnect any devices plugged into external power receptacles.
•
Allow lamps to cool for a minimum of 10 minutes.
Lowering Tower (From Upright Position)
•
Loosen screw E to rotate tower.
•
Rotate tower to line up arrows.
•
Tighten screw E.
•
Operate winch B to lower tower.
•
Remove lock pin C.
•
Crank winch A to lower tower to horizontal position. Insert and lock pin D before
moving or lifting unit.
WARNING
!
WARNING
!
Operating & Maintenance Manual
29