Basic Operation; Replacing The Axis Compression Springs - VIRPIL VPC MongoosT-50 Base Quick Start Manual

Table of Contents

Advertisement

BASIC​ ​ O PERATION
● The VPC MongoosT-50® Base is compatible with the VPC Extensions. Extensions up to
150mm are supported, extensions larger than this are not recommended, especially when
combined​ ​ w ith​ ​ h eavier​ ​ s prings.
● The VPC MongoosT-50® Base should be mounted with the included VPC U-Bracket. If this is
unsuitable, a custom mount can be created to connect directly to the existing 4 x VPC
U-Bracket mounting points. Different length screws should be used to account for the
difference between the original VPC U-Bracket and any custom solution. It is not
recommended to mount the base via the underside bolts. Any damage caused by a custom
mounting​ ​ s olution​ ​ i s​ ​ n ot​ ​ c overed​ ​ b y​ ​ t he​ ​ ​ ​ s tandard​ ​ w arranty.
● When adjusting the spring loading screws via the upper plate adjustment holes the minimum
allowed tension is when half of the joysticks deflection is free of any spring force. The
maximum allowed tension is achieved by roughly 25 clockwise turns. Over tensioning the
spring loading screws can result in the joysticks total deflection being limited. If you require
stronger​ ​ s pring​ ​ t ension,​ ​ r eplace​ ​ t he​ ​ a xis​ ​ c ompression​ ​ s prings​ ​ f or​ ​ t he​ ​ h eavier​ ​ s et.
● The VPC MongoosT-50® Base is a complex piece of equipment aimed at the experienced
user. Replacing the springs and cams can be a complicated process and if you are at all
unsure, please contact VPC directly for help to avoid damage to your set. User damage while
attempting to make adjustments to the base is not covered by the manufacturer warranty
and​ ​ w ould​ ​ b e​ ​ s ubject​ ​ t o​ ​ a ​ ​ r epair​ ​ c ost.
REPLACING​ ​ T HE​ ​ A XIS​ ​ C OMPRESSION​ ​ S PRINGS
1. Disconnect​ ​ t he​ ​ b ase​ ​ U SB​ ​ c able​ ​ f rom​ ​ t he​ ​ P C.
2. Remove​ ​ t he​ ​ b ase​ ​ f rom​ ​ t he​ ​ V PC​ ​ D esk​ ​ M ount​ ​ o r​ ​ o ther​ ​ m ounting​ ​ m ethod.
3. Remove​ ​ t he​ ​ a ttached​ ​ g rip​ ​ f rom​ ​ t he​ ​ b ase.
4. Loosen the spring loading tension on the Pitch ​
the​ ​ a djustment​ ​ h oles​ ​ o n​ ​ t he​ ​ u pper​ ​ p late.
5. Remove the 4 x M4 screws from the lower plate ​
safe​ ​ l ocation​ ​ t o​ ​ a void​ ​ d amage.
6. Remove​ ​ t he​ ​ 4 ​ ​ x ​ ​ M 4​ ​ s crews​ ​ f rom​ ​ t he​ ​ u pper​ ​ p late​ ​ ​
7. Remove​ ​ 5 ​ ​ x ​ ​ M 3​ ​ s crews​ ​ a ffixing​ ​ t he​ ​ r ubber​ ​ b oot​ ​ s urround​ ​ t o​ ​ t he​ ​ u pper​ ​ p late.
8. Remove​ ​ t he​ ​ 4 ​ ​ x ​ ​ M 4​ ​ s crews​ ​ a ffixing​ ​ t he​ ​ u pper​ ​ p late​ ​ t o​ ​ t he​ ​ g imbal​ ​ s tructure​ ​ ​
9. Completely remove the rubber boot ​
grip​ ​ s tem​ ​ ​
( FIGURE​ ​ 1 ​ ​ - ​ ​ # 4)​
10. Completely loosen the spring loading screw for the axis you wish to replace the spring on.
While​ ​ y ou​ ​ d o​ ​ t his,​ ​ h old​ ​ t he​ ​ c ylindrical​ ​ n ut​ ​ f rom​ ​ t he​ ​ l ower​ ​ s ide​ ​ o f​ ​ t he​ ​ b ase.
11. With the spring loading screw completely loosened, remove it from the gimbal and you will
be able to remove the currently equipped spring. Replace the spring with your desired
choice.
12. Place the spring loading screw with the newly equipped compression spring, back into its
recess.
13. While holding the cylindrical nut from the lower side of the base, hand tighten the screw
until​ ​ t he​ ​ s pring​ ​ s tarts​ ​ t o​ ​ b ecome​ ​ l oaded.
14. Reassemble​ ​ t he​ ​ b ase​ ​ b y​ ​ r epeating​ ​ t he​ ​ s teps​ ​ i n​ ​ r everse​ ​ f rom​ ​ s tep​ ​ 9 .
VPC​ ​ M ONGOOST-50​ ® ​ ​ ​ B ASE
QUICK​ ​ S TART​ ​ G UIDE
( FIGURE 1 - #6)
( FIGURE​ ​ 1 ​ ​ - ​ ​ # 1)​
( FIGURE 1 - #5)
.
6
and Roll ​
( FIGURE 1 - #7)
. Store the lower plate in a
( FIGURE 1 - #13)​
.
( FIGURE​ ​ 1 ​ ​ - ​ ​ # 3)​
​ a nd upper plate ​
( FIGURE 1 - #10)
​ a xes via
.
​ o ver the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VPC MongoosT-50 Base and is the answer not in the manual?

Table of Contents