Guarantee; Storage; Handling; Electric Insulation Test - ABB APC Series Installation, Operation And Maintenance Instructions

Capacitor bank
Table of Contents

Advertisement

Available languages

Available languages

1.5.

Guarantee

Prior to dispatch, all our equipment is tested in compliance with the requirements of EN 60831-1 & 2 (for AC
capacitors up to 1000V) and EN 61921 (Power capacitors - Low voltage power factor correction banks) and it
is guaranteed in accordance with our standard sales conditions.
1.6.

Storage

The APC must be stored indoors, in a dry, dust free, non-corrosive atmosphere and protected from vibrations
or shocks.
The storage temperature must be between -20°C and + 60°C.
1.7.

Handling

After having carefully unpacked the equipment, check that
the characteristics noted on the nameplates correspond to the ones specified in your purchase order.
the material does not appear to be damaged and particularly the central frame, the rear and top panels.
Any damage should be notified immediately to your closest local ABB agent.
Be very careful to avoid personal injury and damage to the equipment while setting upright the boxes and
cubicles.
Suitable equipment for handling the cubicles such as a hoist is highly recommended. Use the lifting lugs that
are provided for this purpose.
Avoid shocks and bumps.
Take care not to damage the plinth of the cubicles while setting upright them.
1.8.

Electric insulation test

Before applying voltage, make an electric insulation test of 2.5 kV between the earth and the short-circuited
phases.
Any damage resulting of this test should be notified immediately to your closest local ABB agent.
WARNING:
End this test by removing the short circuit of the phases.
8

Figure 1.1. APCM and APCR setting upright

APC - Chapter 1. Read this first

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apcl1Apcl2Apcm1Apcm2Apcr

Table of Contents