1. Read this first

1.1.

About this instruction manual

This instruction manual is intended to help you install and operate, quickly and efficiently, your APC
automatic capacitor bank, with the guarantee of optimum operation.
1.2.

Safety

Before installation and operation of the APC automatic capacitor bank, read this instruction manual carefully.
Keep it at the disposal of the people in charge of the installation, operation and maintenance.
Do not introduce or store any extraneous body in the automatic capacitor bank.
Take care not to obstruct the ventilation grids.
Power capacitors operate continuously at full load. Please respect the points below:
Installation and maintenance must only be carried out by authorized and qualified personnel, in
accordance with current local regulations.
Isolate the equipment from the power supply before attempting to gain access.
Wait five minutes to allow the capacitor to discharge through the discharge resistors. As an additional
precaution before starting work, short-circuit the capacitor terminals with a piece of insulated cable (bare
at the ends) to confirm discharge.
Check that the secondary winding of the current transformer is short-circuited or connected to another
parallel load (with a sufficiently low impedance) while connecting or disconnecting measuring instruments
or relays. An open secondary winding of a loaded current transformer may cause dangerous
overvoltages.
The APC automatic capacitor bank must be installed according to EN 61921 and local specifications.
1.3.

APC types

The APC exists in five different types:
2 types of boxes: APCL1 and APCL2
3 types of cubicles: APCM1, APCM2 and APCR
Note that APCL2, APCM2 and APCR types exist in slave execution. Slave units are not equipped with PF
controller but with an interconnection cable (factory wired).
1.4.

Inspection on reception

Make sure that the packaging has not been damaged in transit.
Any loss or damage should be notified immediately to your closest local ABB agent.
The small boxes (APCL1) are delivered upright.
The big boxes (APCL2) are delivered on their side and 2 units maximum can be stacked one on top of the
other for transit and storage.
The cubicles (APCM1 and APCM2) are also delivered on their side and 2 units maximum can be stacked
one on top of the other for transit and storage.
No stacking allowed for APCR.