Master (Pil) Apcr Wiring; Earth Connection; Figure 3.12. Master Apcm2 Wiring; Figure 3.13. Master Apcr Wiring - ABB APC Series Installation, Operation And Maintenance Instructions

Capacitor bank
Table of Contents

Advertisement

Available languages

Available languages

Special features connection
Special features connection
PF controller connection
(terminal labels: X, 15, A)

Figure 3.12. Master APCM2 wiring

Please revert to the schematic diagrams fitted with the bank for exact label of the wires.
3.4.5.3.

Master (PIL) APCR wiring

The cable is divided in two main parts: the step control (to the PF controller) and special features (to a
dedicated terminal).
Special features connection
Special features connection
PF controller connection
(terminal labels: X, 15, A)

Figure 3.13. Master APCR wiring

Please revert to the schematic diagrams fitted with the bank for exact labels of the wires.
After wiring, please check that the cable is properly fixed in the bank.
3.4.6.

Earth connection

The APCL earth connections are made by means of a stud (∅ M6). This one is welded inside the APCL in
the lower right corner. The door is already connected to this stud. It only remains to connect the earth wire if
the power cable is fitted with it. For the APCM and APCR, the earth connection can be made by means of
one of the two stud (∅ M8) located in the upper and lower left corners.

Figure 3.14. Earth connection

APC - Chapter 3. Installation
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apcl1Apcl2Apcm1Apcm2Apcr

Table of Contents