Right Angle Crossfold System; Installation - Challenge MEDALIST 820 Instructions And Parts Manual

Air feed table model folder
Table of Contents

Advertisement

RIGHT ANGLE CROSSFOLD SYSTEM

Challenge offers a Right Angle Crossfold System which
is used in conjunction with the Medalist
The System consists of a second parallel unit, a cross-
fold carrier table, shorter stand and a transfer assem-
bly which displaces the delivery table of the folder (the
delivery table is placed on the back of the crossfolder).
CAUTION: Disconnect the power to all
units before positioning the crossfold sys-
tem and making the electronic connections.

Installation

1. Remove the stacker wheel assembly and delivery
table from your folder. See note on page 70.
2. Reposition the folder on its stand. Move the folder to
the back edge of the stand as shown in the photo above,
fig. 32.
3. Place the folder for the crosscarrier onto its stand. It
should also be positioned towards the back edge of its
stand as shown in fig. 32.
4. Install the cross carriage support legs to the cross
carriage frame, (fig. 33). The legs are mounted with
3
two, #10-24 x
/
" button head cap screws.
8
5. Insert the crosscarrier assembly between the side
frames making sure the support legs rest on the cross-
carrier stand. Make sure the mounting pins for the
crosscarrier conveyor assembly are in the lower set of
holes in the roller side frames, (fig. 34). Install the left
hand screw first, then the right hand side.
20
Button Head
Button Head
Mounting Screws
Mounting Screws
Support
Support
Leg
Leg
Leveling
Leveling
Screw
Screw
A little downward pressure on the crosscarrier assem-
bly will help to align the holes to aid installing the mount-
ing screw (the friction drive is located under the right
side requiring the pressure to align the mounting holes).
(fig. 32)
(fig. 33)
Use LOWER hole
for Crosscarrier
Mounting Pin
(fig. 34)
F.669-D/820-870/Jan 98

Advertisement

Table of Contents
loading

This manual is also suitable for:

Medalist 870

Table of Contents