Technogel FREEZER 200/1 Instructions For The Installation, Use And Maintenance page 49

Table of Contents

Advertisement

INDEX
Introduction – Authorized personnel – Installation and initial startup of machine
Instructions for unpacking the machine
Instructions for lifting the machine - How to move the machine
Positioning of different facilities
Machine identification
Electrical installation
Connection of water supply
Pneumatic connection – Ice-cream mixture connection
Description of machine control panel
Instructions for dismantling mixer turbine - Checking the direction of rotation
Correct assembly of the turbine and knives
AUTHORIZED AND UNAUTHORIZED USAGE – Conditions of usage
Operation of the machine
Start-up of the machine
Instructions for calculating ice-cream over-run
Regulation of ice-cream viscosity with hot gas valve – Use of pump safety valves
Checking operation of the refrigerating system
Washing the machine
Noise level - Ecological warning – Warning of possible breakdown of the machine
Maintenance
Technical assistance
Trouble-shooting
Trouble-shooting faults in the pump unit
Leakage from the packing gland
Technical characteristics
Electrical installation
Spare parts
 Pump units
 Pump variator assembly with connecting rods
 Speed variator with connecting rod components list
 Dasher unit with packing gland and knives
 Control panel unit
 Refrigeration plant with SCKROLL compressor
 Refrigeration plant with COPELAND
 Compressed air regulation, filtering and reduction unit
 Support unit with flange and ventilator
 Dasher drawing motor unit
 Hot gas valve unit – Flange unit with turbine centering device
 Ice-cream outlet faucet unit
 MACHINE OPERATION WITH SERVOFREEZER
 Servo-freezer
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27-28-29
30
31
32
33
34
35
36-37
38-39
40
41
42
43
44
45
46-47
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents