Page 19
• Prevent dust, water or other contaminants from entering the piping during installation. Contaminants can cause mechanical failure. LG Engineered Y-branch Kits and Header Kits LG Y-branch and Header kits are highly engineered devices designed to evenly divide the flow of refrigerant, and are used to join one pipe segment to two or more segments.
Page 24
Field-Provided Isolation Ball Valves LG maintains a neutral position on using isolation valves in VRF refrigerant piping systems. LG does not endorse any manufacturer of isola- tion valves. It is recognized that installing isolation valves may simplify future maintenance requirements, and, if used, considerations should be taken including, but not limited to, the following: •...
Page 34
® ® To ensure that the refrigerant piping design meets LG’s quality standards, a LATS refrigerant piping design must be provided with created and provided to LG prior to system commissioning to ensure the proper pipe size has not changed.
Page 46
Applying Insulation to Y-Branch and Header Fittings point where the insulation jacket ends. Remove the jacket. Install field-supplied insulation on the pipe segments first, and then install the LG provided insulation plugs on the ends of all unused Header ports. Apply the clam-shell insulation on jackets to Y-branch and Header fittings last.
Page 52
NEVER splice, cut, or extend cable length with field provided cable. If the length needs to be extended, the LG Extension Kit (sold separately) must be used. A maximum of four (4) kits (up to 165 On All Indoor Unit Styles feet) can be used.
Page 58
Can be assigned at will or for example, can follow the room layout on each floor. For each LG Central Controller product provided on the project, devise a central control address schedule and assign a central control address to each indoor unit(s) Hydro Kit(s), and ERV(s) units. Record this central control address for each component in the column provided on the Pre-commissioning Device Configuration Worksheet.
Page 67
• • Refrigerant charge is too high (overcharge). For detailed information on how to troubleshoot each error, see the Multi V S Service Manual on www.lg-vrf.com. Due to our policy of continuous product innovation, some specifications may change without notification.
Page 68
130% of the nominal outdoor unit capacity. For detailed information on how to troubleshoot each error, see the Multi V S Service Manual on www.lg-vrf.com. Due to our policy of continuous product innovation, some specifications may change without notification.
Page 69
Disconnection or short circuit of outdoor unit oil level sensor. For detailed information on how to troubleshoot each error, see the Multi V S Service Manual on www.lg-vrf.com. Due to our policy of continuous product innovation, some specifications may change without notification.
Page 75
Record Communication Voltage Range High ___________ VDC Low ____________ VDC LG-supplied cable was used between each indoor unit and its zone controller. No cables were spliced and no wire caps are present. Communication type RS-485–BUS type. Power wiring to the outdoor unit must be solid or stranded, and must comply with all local and national electrical codes.
Page 85
20001747 ISO 9001: 2008 LG ELECTRONICS INC. Refer to Service Manuals posted on www.lghvac.com for a full description of all error codes and work-arounds. LG Electronics Products Support 1-888-865-3026 USA LG Electronics, U.S.A., Inc. Follow the prompts for HVAC products.
Need help?
Do you have a question about the MULTI V S ARUN038GSS4 and is the answer not in the manual?
Questions and answers
Ch150 error