Harken REFLEX FURLING Unit 1 Installation Manual page 14

Table of Contents

Advertisement

Assembly
6. Building the tack terminal: Follow the
procedure used to build the head swivel
terminal.
Tip: Wait to shrink the heat shrink tub-
ing until the sail is hoisted and sailed in
case length adjustments are necessary.
8. Checking the length: Attach the drive
unit to the bow fitting or pole. Hoist the
cable without sail to check the length. Use
the halyard winch to tension the halyard
enough to straighten the cable.
Tip: Unlike fibrous torsion cables, the
Reflex torsion cable transmits torque
at lower halyard loads. IMPORTANT!
Over-tensioning the halyard can make
furling more difficult and can damage
components.
Adjust the tack line if necessary.
14
Building Terminal and Length Chck at Boat
Do not use heat-
shrink tube until
length is set.
Reflex furler

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Harken REFLEX FURLING Unit 1

This manual is also suitable for:

Reflex furling unit 27351.107361.107352.107362.10

Table of Contents