9. Connect the Bottom Spiral Track to the Top Spiral Track, then
secure them with Spiral Track Supports A, B and C.
10. Next, insert the Crane into the Spiral Track, then connect
additional track pieces as shown in image B below.
11. Insert the Windmill and the Pump Lever into the Unloading
Platform.
15
15
15
Need help?
Do you have a question about the Toot-Toot Drivers Train Set and is the answer not in the manual?
Questions and answers