Summary of Contents for Jackedin Power Locker JACK
Page 1
For safe and proper installation JackedIn Power recommends installing the Locker JACK as indicated below: 1. Choose a location for the Locker JACK that has a 110 V outlet within 6 feet of the power entry module. Remove the Control Key that is taped to the back of the unit and store in a safe and secure location outside of the Locker JACK.
Page 2
Installation (cont) 3. After installing the two 90 degree brackets to the wall, team lift (more than one person) the Locker JACK onto the previously mounted brackets. Line up the four mounting holes on the bottom of the Locker unit with the four bracket holes and install the four 10-32 x 5/8”...
Page 3
5. Lastly, install the included power cord and plug the Locker JACK into the available 110V outlet. Proceed to the next section with respect to opening the Locker JACK for the first time. Unlocking the door for the first time.
Page 4
Daily use of the Locker JACK 1. Enter the required code (Manager or User Code) to open the Locker JACK 2. Use your chosen USB charging cord and plug the USB end into on of the 40 available USB ports and the other end of the cable into your phone.